Hydraulic Steel Pipe Water Pressure Tester, Watertightness of Steel Pipe, Customizable

Product Details
Customization: Available
After-sales Service: One Year of Online Service
Warranty: One Year
Gold Member Since 2023

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

to see all verified strength labels (11)
  • Hydraulic Steel Pipe Water Pressure Tester, Watertightness of Steel Pipe, Customizable
  • Hydraulic Steel Pipe Water Pressure Tester, Watertightness of Steel Pipe, Customizable
  • Hydraulic Steel Pipe Water Pressure Tester, Watertightness of Steel Pipe, Customizable
  • Hydraulic Steel Pipe Water Pressure Tester, Watertightness of Steel Pipe, Customizable
  • Hydraulic Steel Pipe Water Pressure Tester, Watertightness of Steel Pipe, Customizable
  • Hydraulic Steel Pipe Water Pressure Tester, Watertightness of Steel Pipe, Customizable
Find Similar Products
  • Overview
  • Product Description
  • Detailed Photos
  • Product Parameters
  • Installation Instructions
  • FAQ
  • Similar products
  • Function Introduction
Overview

Basic Info.

Model NO.
Soar-01
Water Supply
Industrial Filtered Water
Compressed Air
Pressure0.4-0.6MPa
Flow Rate
1m3/Min;
Hydraulic Oil
46# Anti-Wear Hydraulic Oil
Transport Package
Wooden Box
Specification
6750*550*1350mm
Trademark
Soar
Origin
China, Shandong
Production Capacity
10 Sets/Month

Product Description

Product Description

Suitable for hydrostatic pressure test of steel pipes with outer diameter of 25mm~88.9mm, length of 4~6m, and pressure ≤4Mpa.
The hydraulic press adopts the middle pipe inlet and outlet type, the clamp is set at the central pressure test station of the hydraulic press, and the pipe inlet/outlet is automatically lifted and moved.
The steel pipe with a spray port welded on the pipe requires the buyer to manually assist the single pipe inlet.
Steel pipe O.D. 25~48.3mm,0.8mm alarmed automatically if have leakage hole;
Steel pipe O.D. 60.3~88.9mm,2.0mm alarmed automatically if have leakage hole.

 

Detailed Photos

Hydraulic Steel Pipe Water Pressure Tester, Watertightness of Steel Pipe, CustomizableHydraulic Steel Pipe Water Pressure Tester, Watertightness of Steel Pipe, CustomizableHydraulic Steel Pipe Water Pressure Tester, Watertightness of Steel Pipe, CustomizableHydraulic Steel Pipe Water Pressure Tester, Watertightness of Steel Pipe, CustomizableHydraulic Steel Pipe Water Pressure Tester, Watertightness of Steel Pipe, Customizable

Product Parameters
Equipment Power/kW Qty/set

 
Total kW
Hydraulic pump 28ml/r 15 1 15
Water injection pump 32m,12m3/h 5.5 1 5.5
High pressure booster pump 4Mpa,3m3/h 4 1 4
Stepper tube shifter motor 4 1 4
Lifting and panning steel inlet/outlet pipe unit motors 4 2 8
Water injection/exhaust seal seat drive motor 5.5 2 5.5
Total     47.5
 
Installation Instructions

 Factory conditions
1 Environment: temperature 5~50°C (can be used in winter as long as it is not frozen), humidity 10%~100%, seismic intensity 8 degrees;
2 Power supply: voltage AC 380V±10%, frequency 50HZ±1, power 50kW;
3 Water supply: industrial filtered water (tap water can be used), total floating matter 5mg/L, hardness 10.6Dh, pressure 0.15~0.50MPa;
Circulating water, pressure 0.15~0.50MPa;
4 Compressed air: pressure 0.4~0.6 MPa, flow rate: 1m3/min;
5 Test liquid: water + emulsifier, ratio 3% ~ 5%, liquid circulation;
6 Hydraulic oil: 46# anti-wear hydraulic oil.
1.1.4 Steel pipe parameters
1 Outer diameter of steel pipe (mm): ¢33.4mm~88.9mm;
2 Length of steel pipe (mm): 4~6m, the length deviation of each batch of steel pipes is less than 5mm
3 Wall thickness of steel pipe (mm): mm
4 End form of pipe: with groove or thread
Process flow
Material storage rack → the step-by-step pipe moving device moves four steel pipes to the material waiting rack → the horizontal feeding conveying device rises and horizontally moves the steel pipe to be pressure tested to the pressure testing station of the hydraulic press → clamps → the pressure test heads at both ends move forward → pipe end seals → water injection and exhaust → exhaust valve closes → water injection valve closes → pressurization → pressure maintenance → pressure relief → pressure test heads at both ends move back → release the clamps → steel pipes are sent out → next cycle.

FAQ

1 how long have you been in this filed?
we have been in this filed for more than 15 years
2 Do you have any Certification with product or your factory?
yes, we have passed TUV certification with our product and factory
3 where is your factory?
we are in shandong province,it is about 150KM far from Qingdao port
4 Can we be as your agent in our country?
yes, if you have this idea, welcome to visit our factory and talk about this, or we fly to visit you

Similar products

Hydraulic Steel Pipe Water Pressure Tester, Watertightness of Steel Pipe, Customizable

Function Introduction

 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier